1. Solder/Glue these three sections together – make sure that you get the indicated FFF and RRR.2. Put on the 1and 14 end brackets.3. Start to fix all other internal brackets -make sure 2a slots into 2a position. Spring sides Continue reading →
Construction:a: Start of Assembly —— Fit together the side framesto the base.b: Make sure to fit the pivot re-inforcing tabs when sliding the front panel back at an angle.c: Fold up the top tray and attach to crane base at Continue reading →